Markets

UPDATE: Duluth Reports Assay Results from Twin Metals Minnesota's Birch Lake Deposit; Shares Down Slightly Near Midday

Duluth Metals Limited (DM.TO) announced assay results for 28 holes on the Birch Lake Deposit within the Twin Metals Minnesota Project in northeastern Minnesota today.

Drilling highlights in the Birch Lake Deposit include:

BL11-07-W1 returned a 153.5 foot intersection of 0.767% copper, 0.197% nickel, 3.0 g/t silver and 1.988 grams TPM (TPM = Platinum+Palladium+Gold) at a 0.5% Cu cut-off.

BL11-05 returned a 67.5 foot intersection of 0.710% copper, 0.230% nickel, 2.5 g/t silver and 1.817 grams TPM at a 0.5% Cu cut-off.

BL12-09 returned a 101.3 foot intersection of 0.862% copper, 0.273% nickel, 3.0 g/t silver and 1.237 grams TPM at a 0.5% Cu cut-off.

BL12-10 returned a 53 foot intersection of 0.638% copper, 0.182% nickel, 2.3 g/t silver and 1.158 grams TPM at a 0.5% Cu cut-off.

Duluth is down 2 cents to $2.40, on volume 11,600.

The views and opinions expressed herein are the views and opinions of the author and do not necessarily reflect those of Nasdaq, Inc.

Copyright (C) 2016 MTNewswires.com. All rights reserved. Unauthorized reproduction is strictly prohibited.


The views and opinions expressed herein are the views and opinions of the author and do not necessarily reflect those of Nasdaq, Inc.

Other Topics

Commodities

Latest Markets Videos