Camino Minerals Corporation (COR.V), which closed Friday at a year low 12 cents, reported that it has received final assay results from the remaining 19 holes at its 100% owned Rodeo Gold Project, located in Durango State, Mexico, with hole RO-11-026 returning 1.06 g/t Au and 13.00 g/t Ag over 102.25 metres, including 2.58 g/t Au and 5.00 g/t Ag over 19.15 metres.
Camino's diamond drill program, which ended in October, 2011, totaled 6,238.20 metres in 29 holes and tested a 5-kilometre long north, north-west trending epithermal system. Results from the first 10 holes were reported by the Company in a news release dated October 7, 2011.
The views and opinions expressed herein are the views and opinions of the author and do not necessarily reflect those of Nasdaq, Inc.
Copyright (C) 2016 MTNewswires.com. All rights reserved. Unauthorized reproduction is strictly prohibited.
The views and opinions expressed herein are the views and opinions of the author and do not necessarily reflect those of Nasdaq, Inc.