After Collapse, Temporary Bridge Could Be Up By June - Presented by: The Aol. On Network

Gov. Jay Inslee announced a plan Sunday to replace the collapsed portion of the Interstate 5 bridge over the Skagit River with a temporary four-lane span until a permanent replacement is built and opened to traffic. “We will install a temporary span on the bridge that will restore traffic while we build a safe and durable permanent span adjacent to it,” Inslee said. “This plan ensures the economic vitality of Washington state and the communities along this important corridor.”



Related Videos

Most Popular Videos

Latest Videos


Most Active by Volume

Company Last Sale Change Net / %
AAPL $ 97.19 2.47 ▲ 2.61%
FB $ 71.29 2.02 ▲ 2.92%
MSFT $ 44.87 0.04 ▲ 0.09%
EMC $ 28.75 0.23 ▲ 0.81%
BAC $ 15.52 unch
SIRI $ 3.46 0.02 ▼ 0.57%
JNPR $ 22.43 2.39 ▼ 9.63%
YHOO $ 34.71 1.11 ▲ 3.30%

As of 7/23/2014, 04:04 PM
More Most Active