Caledonia Mining Reports Blanket Mine Gold Production Results; Shares Up 10%

By MT Newswires January 14, 2013, 11:54:16 AM EDT

Caledonia Mining Corporation (CAL.TO) today announced gold production from the Blanket Mine in Zimbabwe during the fourth quarter ending December 31, 2012 and for the 2012 calendar year.

11,980oz of gold were produced during the Quarter, a 14% increase on gold production in Q4 2011 (10,533oz) and a 7% decrease on Blanket's record quarterly gold production in Q3 2012 (12,919oz).

Total gold production for the 12 months to December 31, 2012 was 45,623oz, a 27% increase over the gold production in the 12 months to December 31 2011 (35,826oz).

Caledonia's President and CEO, Stefan Hayden said: "As anticipated and as previously advised, gold production in Q4 was lower than in Q3 as the achieved grade returned towards the long term average of 3.84g/t. The production of 11,980oz achieved in Q4 is an excellent performance by Blanket and is 16.5% higher than the targeted production of 10,000 oz/quarter. Production for the whole of 2012 of over 45,600oz is a new annual production record for Blanket and reflects the outstanding performance of Blanket's management and staff during the year with its multitude of challenges."

Shares are up 1 cent (10%) to 11 cents at midday.Close to 1 million shares have been traded.




The views and opinions expressed herein are the views and opinions of the author and do not necessarily reflect those of The NASDAQ OMX Group, Inc.


This article appears in: Investing, Commodities

Referenced Stocks:



Latest News Video






Most Active by Volume:

Company Last Sale Change Net / %
PFE $ 29.40 0.24  0.82%
NOK $ 3.86 0.17  4.61%
S $ 7.32 0.10  1.39%
BAC $ 13.27 0.06  0.45%
GE $ 24.33 0.56  2.36%
MU $ 13.76 0.52  3.93%
SIRI $ 3.40 0.06  1.80%
MNKD $ 6.605 0.94  12.40%